Skip to main content
Activeted-475423-2026

Repair of watercraft for renewal of EU navigation certificate

Repair of watercraft for renewal of the EU navigation certificate, divided into lots: The detailed scope of work and execution conditions are specified in the tender documents (Annex No. 1 and Annex No. 8 to the SWZ). Execution for Lot 1 is within 60 calendar days from the handover of the unit to the contractor; the unit handover must occur no later than 14 days after contract signing.

PLN 2,730,000
View original source

CONTRACTING AUTHORITY

Name

Państwowe Gospodarstwo Wodne Wody Polskie

City

Warszawa

Country

PL

CLASSIFICATION

Procedure Type

Open Procedure

Contract Type

Services

Main CPV

50241000, Repair and maintenance services of ships.

Other CPV

50241100, Vessel repair services.

50246100, Dry-docking services.

50241100, Vessel repair services.

50246100, Dry-docking services.

50241100, Vessel repair services.

50246100, Dry-docking services.

LOTS (3)

LOT-0001Services

Reparatur des Eisbrechers 'Tygrys'

PLN 2,730,000

LOT-0002Services

Reparatur des Eisbrechers 'Rekin'

€960,000

LOT-0003Services

Reparatur des Schlepp- und Schubschiffes 'Brda'

€2,116,000

ADDITIONAL DETAILS

EU Funded

Yes

Suitable for SMEs

Yes

Electronic Submission

Required

Legal Basis

32014L0024

DEADLINES & TIMELINE

Submission Deadline

3 days remaining

(LOT-0001)

Published

TENDER DOCUMENTS

3 days remaining

Similar Tenders

Explore CPV 50
PLN 115,833

Buoys for maintenance of WJM System shipping routes

Delivery of buoys for the maintenance of WJM System shipping routes; further items as per the tender documents.

Państwowe Gospodarstwo Wodne Wody Polskie

·Warszawa
Deadline:August 10, 2026
PLN 13.4M

Reconstruction of flood embankments for the Radunia, Kłodawa, Bielawa rivers

Design and construction services for the reconstruction of flood embankments for the Radunia, Kłodawa, and Bielawa rivers: The project includes the development of multi-branch design documentation and the execution of construction works. The overall service is divided into partial lots. The execution period is up to 590 days from contract signing, with the design phase lasting up to 317 days and the construction phase up to 590 days.

Państwowe Gospodarstwo Wodne Wody Polskie

·Warszawa
Deadline:August 18, 2026
PLN 1.2M

Underwater Inspection and Maintenance for Icebreakers Puma, Narwal, Orka, and Foka

Underwater inspection and maintenance of icebreakers Puma, Narwal, Orka, and Foka to maintain their class certificate and EU navigability certificate, divided into lots.

Państwowe Gospodarstwo Wodne Wody Polskie

·Warszawa
Deadline:July 20, 2026

Reconstruction of flood protection embankments for the Motława River in Gdańsk

Design and construction of flood protection embankments for the Motława River in Gdańsk: Reconstruction of the left and right flood protection embankments over a length of approx. 2,541 m on the right bank and approx. 2,702 m on the left bank, totaling approx. 5,243 m of embankments, within a project area of approx. 8.585 ha, to increase flood safety and adapt to hydrotechnical structure class II. The contract includes the preparation of multi-branch design documentation and obtaining all necessary permits. Construction works comprise preparatory and demolition works; basic works on water intakes with 3 temporary working cofferdams, drainage, earthworks, ground reinforcement, construction of a reinforced concrete intake structure, and technological equipment with 600 x 600 mm gate valves; as well as basic works for the reconstruction of flood protection embankments with earthworks, reinforcement of the embankment crest and access roads with prefabricated multi-hole reinforced concrete slabs, slope reinforcements, protection against beaver activity, vertical reinforcement at the mouth of the Radunia River in the form of steel sheet piles of approx. 7.75 m length topped with a reinforced concrete capping beam, and additional works. The execution period is up to 29 months from contract signing, with the design phase (Phase I) lasting up to 20 months (Stage I up to 10.5 months, Stage II up to 16.5 months, Stage III up to 20 months) and the construction phase (Phase II) up to 29 months.

Państwowe Gospodarstwo Wodne Wody Polskie

·Warszawa
Deadline:August 14, 2026

Find matching tenders automatically

With Patterno-HIT, receive relevant tenders daily, automatically filtered to your company profile.

Book Demo Now