Reconstruction of flood embankments for the Radunia, Kłodawa, Bielawa rivers
Design and construction services for the reconstruction of flood embankments for the Radunia, Kłodawa, and Bielawa rivers: The project includes the development of multi-branch design documentation and the execution of construction works. The overall service is divided into partial lots. The execution period is up to 590 days from contract signing, with the design phase lasting up to 317 days and the construction phase up to 590 days.
CONTRACTING AUTHORITY
Name
Państwowe Gospodarstwo Wodne Wody Polskie
City
Warszawa
Country
PL
CLASSIFICATION
Procedure Type
Open Procedure
Contract Type
Works
Main CPV
45000000, Construction work.
Other CPV
71320000, Engineering design services.
71322000, Engineering design services for the construction of civil engineering works.
45240000, Construction work for water projects.
45246000, River regulation and flood control works.
45246400, Flood-prevention works.
45246200, Riverbank protection works.
45100000, Site preparation work.
45111200, Site preparation and clearance work.
71320000, Engineering design services.
71322000, Engineering design services for the construction of civil engineering works.
45240000, Construction work for water projects.
45246000, River regulation and flood control works.
45246400, Flood-prevention works.
45246200, Riverbank protection works.
45100000, Site preparation work.
45111200, Site preparation and clearance work.
LOTS (2)
Umbau von Hochwasserschutzdeichen für den Fluss Kłodawa
PLN 13,352,172
Umbau von Hochwasserschutzdeichen für den Fluss Bielawa
€14,124,676
ADDITIONAL DETAILS
EU Funded
Yes
Suitable for SMEs
Yes
Electronic Submission
Required
Legal Basis
32014L0024
DEADLINES & TIMELINE
Submission Deadline
35 days remaining(LOT-0001)
Published