Skip to main content
Activeted-494735-2026

Sanitary Renovation for the Max Planck Institute General Administration

Sanitary installations: main pipe renovation, phased establishment of a decentralized hot water supply, establishment of a central hot water supply for selected areas, replacement of a lifting unit, and modification of several fittings for the Max Planck Institute General Administration in Munich. The renovation will be carried out during ongoing operations in several construction phases. Maintenance services are included. Execution start is within 12 working days after request (expected by 09.10.2026), completion within 1,251 working days after the start of execution (5 working days/week).

CONTRACTING AUTHORITY

Name

Max-Planck-Gesellschaft Abt.III

City

München

Country

DE

CLASSIFICATION

Procedure Type

Open Procedure

Contract Type

Works

Main CPV

45330000, Plumbing and sanitary works.

Other CPV

45232410, Sewerage work.

45332200, Water plumbing work.

ADDITIONAL DETAILS

EU Funded

Yes

Suitable for SMEs

No

Electronic Submission

Required

Legal Basis

32014L0024

DEADLINES & TIMELINE

Submission Deadline

31 days remaining

(LOT-0001)

Published

TENDER DOCUMENTS

31 days remaining

Similar Tenders

Explore CPV 45

Sanitary Installations for Renovation BT B, MPI for Terrestrial Microbiology

Sanitary installations: Installation of stainless steel cold drinking water distribution systems, assembly of sanitary installation elements and sanitary objects, installation of fittings and hygiene flushing stations, installation of wastewater pipes for foul and rainwater drainage. Additionally, installation of cold drinking water and process water pipes, installation of central distributors for cold drinking water, process water, compressed air, nitrogen, and demineralized water, laying of laboratory media pipes (demineralized water pipes made of PP-h, nitrogen and compressed air pipes made of copper), installation of emergency showers.

Max-Planck-Gesellschaft Abt.III

·München
Deadline:August 14, 2026

Electrical engineering services for renovation of House 11, Max Planck Institute Göttingen

Engineering services for electrical engineering according to §§ 53 ff. HOAI 'Technical Equipment' in several call-off stages for the expansion of the Max Planck Institute in Göttingen: plant groups 4 (heavy current), 5 (telecommunication and information technology systems), 6 (conveying systems). The estimated total construction costs (KG 200 to 700) are approximately 12.149 million € net, with eligible costs for the mentioned plant groups estimated at approximately 1,604,993 € net. The gross floor area is 2,635 m², and the gross volume is 10,539 m³. Connection to the public power grid is via the existing transformer system in the basement of building G11A. A photovoltaic system must be installed on the roof according to §32a NBauO of Lower Saxony, and provisions for future charging infrastructure must be considered. Low-voltage supply for buildings G11A and G11N is from the existing low-voltage switchgear in G11A, which needs adaptation. The low-voltage installation for G11N must be newly built from the switchgear, considering fire protection requirements; the setup via main building and floor distributors is to be examined. General and safety lighting for G11N must be newly installed. Internal and external lightning protection, as well as potential equalization, are to be checked and, if necessary, adapted or renewed. The telecommunication connection and active network components in G11A are to be extended to G11N or newly established centrally. The fire alarm system in G11A is to be adapted and extended to G11N. The existing access control system is to be checked and, if necessary, extended to G11N. IT technology and data infrastructure in G11N are to be adapted to the institute's future needs; the data network for G11N is to be newly built via floor distributors. A shared server room for both buildings may need to be established. Media technology equipment for seminar and meeting rooms, as well as recording and control technology, are to be provided. A passenger elevator for accessibility, serving G11N and possibly G11A, is to be planned. Construction power supply for G11N must be ensured throughout the construction period.

Max-Planck-Gesellschaft Abt.III

·München
Deadline:August 13, 2026

Technical Equipment Planning (HVAC) for the Renovation of House 11 at the Max Planck Institute Göttingen

Specialist planning for technical equipment (HVAC) for the renovation and conversion of the existing building Haus 11 (11A and 11N) of the Max Planck Institute in Göttingen. The measure includes the gutting, fire protection upgrading and expansion of building G 11-N, which was constructed in steel skeleton construction, as well as the energetic upgrading of the facade of building G 11-A. The eligible costs for the building services cost groups (KG 410, 420, 430, 480) amount to a total of 1,284,000 € net. The main trade is specialist planning for heating, ventilation, sanitary and cooling (HVAC) as well as building automation.

Max-Planck-Gesellschaft Abt.III

·München
Deadline:August 13, 2026

Heavy Current Electrical Engineering for New Construction and Renovation of Max Planck Research Center for Pathogens

Installation of a heavy current electrical system including a self-sufficient power supply system for a laboratory and office building: customer-owned part of the medium-voltage switchgear, 2 transformers, emergency power system approx. 50 kW, low-voltage main distribution, GHV old building, 26 sub-distributors, cable laying systems, cables and lines, installation devices and systems, fire protection for cable systems, general lighting system with approx. 850 luminaires, safety lighting with approx. 250 luminaires, lightning protection system. Proof of registration in a network operator's installer directory is required. Start of execution within 12 working days after request (expected by March 16, 2027), completion within 513 working days; submission of workshop and assembly planning no later than 6 calendar weeks before construction start.

Max-Planck-Gesellschaft Abt.III

·München
Deadline:August 14, 2026

Find matching tenders automatically

With Patterno-HIT, receive relevant tenders daily, automatically filtered to your company profile.

Book Demo Now