Heavy Current Electrical Engineering for New Construction and Renovation of Max Planck Research Center for Pathogens
Installation of a heavy current electrical system including a self-sufficient power supply system for a laboratory and office building: customer-owned part of the medium-voltage switchgear, 2 transformers, emergency power system approx. 50 kW, low-voltage main distribution, GHV old building, 26 sub-distributors, cable laying systems, cables and lines, installation devices and systems, fire protection for cable systems, general lighting system with approx. 850 luminaires, safety lighting with approx. 250 luminaires, lightning protection system. Proof of registration in a network operator's installer directory is required. Start of execution within 12 working days after request (expected by March 16, 2027), completion within 513 working days; submission of workshop and assembly planning no later than 6 calendar weeks before construction start.
CONTRACTING AUTHORITY
Name
Max-Planck-Gesellschaft Abt.III
City
München
Country
DE
CLASSIFICATION
Procedure Type
Open Procedure
Contract Type
Works
Main CPV
45311000, Electrical wiring and fitting work.
Other CPV
45315300, Electricity supply installations.
45315500, Medium-voltage installation work.
45315600, Low-voltage installation work.
ADDITIONAL DETAILS
EU Funded
Yes
Suitable for SMEs
No
Electronic Submission
Required
Legal Basis
32014L0024
DEADLINES & TIMELINE
Submission Deadline
28 days remaining(LOT-0001)
Published