Road construction for I/50 Bučovice bypass
Road construction for I/50 on a new route around the town of Bučovice: The construction starts west of the town, approx. 50 m before the intersection with road III/0506 to Maref, at chainage km 17.690. The connection to the original route of I/50 is at the end of the local part of Vícemilice at chainage km 23.530. The total length of the construction is 5,570 m. The new road route will be built in the initial and final sections as a directionally separated two-lane road in design category S 11.5/90. The remaining central part will correspond to category S 13.5/90 (2+1 arrangement) over a length of 1,990 m without transition wedges. The new route crosses the railway line 2 times and includes 3 grade-separated intersections, 6 bridges on road I/50, 1 bridge over road I/50, 2 bridges outside road I/50, and 3 retaining walls, which are designed as separate structures. Also part of the construction is the building of 2 at-grade intersections, 6 relocations of lower category roads, 2 accesses to retention basins, exits, and temporary bypass roads. Furthermore, water management structures, relocation of affected utility networks, construction of embankment bodies, and noise barriers are an integral part of the construction.
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Portal — LOT-0001NON-RESTRICTED-DOCUMENT
- TED HTML — 590261-2026HTML
- TED PDF — 590261-2026PDF
- TED XML — 590261-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.