TGA Planning for the New Construction of Endinger Graben, Sections 1-4
TGA Planning for the new construction and expansion of Endinger Graben, Sections 1-4: Planning of two water level measurement stations (one at station 0+50 at the western end of the new construction section, one at the connecting structure between the flood channel and Endinger Graben west of L 113), including the installation of necessary lines and technical equipment, connection to the existing municipal process control system and FLIWAS, and planning of drives for the planned sluice gates. The overall project includes the new construction of the Erlebach culvert over 413 m, the new construction of Endinger Graben over approx. 1.65 km, the expansion of Endinger Graben over 900 m, and the construction of a flood channel over 530 m for flood relief. Plan changes include the removal of the shallow water zone in Section 2, the removal of planned bridges over Endinger Graben and the flood channel in Section 4, and the conversion of the RB Bergheimer Weg inlet area as an alternative path concept without bridges.
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Portal — LOT-0001NON-RESTRICTED-DOCUMENT
- TED HTML — 571230-2026HTML
- TED PDF — 571230-2026PDF
- TED XML — 571230-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.