Drywall Installation for Kita Lotte Lemke
Drywall installation for a two-story timber construction with a flat roof on a concrete slab foundation, footprint approx. 20x35 m: floor-by-floor execution coordinated with window installation, HVAC, electrical, painting, and plastering works; adherence to fire, sound, thermal, and moisture protection requirements; installation of partition walls and furring on concrete, cross-laminated timber ceilings, or screed, with one wall side remaining open for building services installations; execution of wet room walls and flexible connections; ensuring sound insulation through proper cable routing, mineral wool insulation, and tight connections; predominantly acoustic ceilings, kitchens with hygiene and acoustic requirements.
CONTRACTING AUTHORITY
CLASSIFICATION
Procedure Type
Open Procedure
Contract Type
Works
Main CPV
45421141, Installation of partitioning.
ADDITIONAL DETAILS
EU Funded
Yes
Suitable for SMEs
No
Electronic Submission
Required
Legal Basis
32014L0024
DEADLINES & TIMELINE
Submission Deadline
38 days remaining(LOT-0001)
Published