Kłodawa River Bank Reinforcement in Pruszcz Gdański Municipality
Design and construction for Kłodawa River bank reinforcement: Strengthening of river banks over a length of approximately 5.27 km in the section from km 6+685 to 11+957, excluding the A1 motorway section from km 9+800 to 9+900, in the municipality of Pruszcz Gdański, to improve flood protection for an area of 850 ha in the localities of Cieplewo, Łęgowo, Rusocin, and Żukczyn. Services include preparatory works, demolition works, earthworks, construction works, and additional works. The execution period is 29 months from contract signing, divided into a design phase (up to 20 months, with stages up to 11, 17, and 20 months) and a construction phase (up to 29 months). The minimum warranty period for construction works is 60 months, with a maximum scored warranty period of 84 months. The estimated net contract value is 9,756,097.56 PLN. A bid bond of 60,000.00 PLN is required.
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Portal — LOT-0001NON-RESTRICTED-DOCUMENT
- TED HTML — 561918-2026HTML
- TED PDF — 561918-2026PDF
- TED XML — 561918-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.