Visualization for Autobahn Project A565 (Bonn North Interchange to Bonn Beuel Junction)
Visualization of the planning status for the A.07888.00 autobahn project, Bonn North Interchange to Bonn Beuel Junction (including replacement Rhine bridge): Creation of a realistic and understandable representation of the construction measure and project area within the relevant autobahn section, including subordinate roads, adjacent development, constraints, and affected environmental areas. This includes the integration of an interactive display into the project website, as well as the training and technical support for the Autobahn GmbH's communication contractor. Processing is to occur as much as possible in parallel with the design planning (service phases 3 & 4 of object planning for traffic systems, landscape planning, geotechnics), which commenced in May 2026. An existing model of the planning area can be created early. The visualization of 2 variants will proceed in parallel with the design processing. The overall project is managed using BIM methodology, utilizing existing BIM inventory models and 3D models of the planned traffic system.
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Portal — LOT-0000NON-RESTRICTED-DOCUMENT
- TED HTML — 571024-2026HTML
- TED PDF — 571024-2026PDF
- TED XML — 571024-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.