Construction cleaning for new OR and functional building, BW Central Hospital Koblenz
Rough and fine cleaning of building components: 37,620 m² floor area (rubber, natural stone slabs, epoxy resin coating), 2,061 doors (steel, wood, stainless steel, metal frames), 12,600 m² window area, 7,850 m² light metal facade, 13,520 m² wall coverings, 362 WCs/washbasins, 21 kitchenettes, 1,256 cabinets, shelves, lockers; 3,850 m² fine cleaning of ORs/GMP areas; 500 hygiene checks on 3,250 m²; construction cleaning for electrical engineering and HVAC.
der Bundesrepublik Deutschland vertreten durch das Bundesministerium der Verteidigung vertreten durch das Amt für Bundesbau vertreten durch den Landesbetrieb Liegenschafts- und Baubetreuung Niederlassung Koblenz
·Koblenz