Plastering works for new construction of Integrated Regional Control Center Ostwürttemberg Aalen
New construction of the Integrated Regional Control Centre (IRLS) Ostwürttemberg in Aalen as a multi-storey building with a plinth floor and up to three full storeys. The tender includes plastering works (VE 037) in the interior. The main services include gypsum plaster and cement-lime plaster works on concrete and masonry, as well as foam glass wall insulation in the basement. The plastering trade dominates the measure with main quantities of 1.154 m² wall cleaning surface and 667 m² cement-lime base coat.
DRK Kreisverband Aalen e.V.
·Aalen