Architectural services for successive renovation of Landshut indoor swimming pool
Architectural services for the successive renovation of the Landshut indoor swimming pool: Basic services for service phases 1-9 for building and interior design according to § 34 Abs. 3 HOAI 2021, Part 3, Section 1 in conjunction with Annex 10 HOAI 2021, as well as special services. The renovation of the indoor swimming pool, built in the early 1970s, includes the roof structure, building envelope, pool deck, sanitary and changing areas, and the entire building services infrastructure (ventilation, heating, electrical, treatment plant). The pool system (stainless steel lining from 2005) is in good condition and will not undergo fundamental renovation. Implementation will occur in seven construction phases during summer closing times: BA 1 (roof, ceiling, facade), BA 2 (pool deck), BA 3 (concrete repair), BA 4 (showers, changing rooms), BA 5 (entrance area, gastronomy), BA 6 (technical systems), BA 7 (sauna). Planning is scheduled to start in 2026/2027, with construction planned from 2028 to 2033. Estimated total costs are approximately 12.55 million EUR net, of which approx. 5.5 million EUR net are for KG 300 and approx. 5.2 million EUR net for KG 400.
CONTRACTING AUTHORITY
Name
Stadtwerke Landshut
City
Landshut
Country
DE
CLASSIFICATION
Procedure Type
neg-w-call
Contract Type
Services
Main CPV
71000000, Architectural, construction, engineering and inspection services.
Other CPV
71200000, Architectural and related services.
71221000, Architectural services for buildings.
71240000, Architectural, engineering and planning services.
71250000, Architectural, engineering and surveying services.
71251000, Architectural and building-surveying services.
ADDITIONAL DETAILS
EU Funded
Yes
Suitable for SMEs
Yes
Electronic Submission
Required
Legal Basis
32014L0024
DEADLINES & TIMELINE
Submission Deadline
30 days remaining(LOT-0001)
Published