Skip to main content
Activeted-468212-2026

Specialized Planning for Technical Equipment for the Successive Renovation of Landshut Indoor Pool

Specialized planning for technical equipment for the successive renovation of the Landshut indoor pool: Basic services for planning phases 1-9 for system groups 1, 2, 3, 7, 8 according to § 55 Abs. 1 S. 2 HOAI 2021, Part 4, Section 2 in conjunction with Annex 15 HOAI 2021, as well as special services. The renovation of the indoor pool, built in the early 1970s, includes the roof, ceiling, facade, bathing plate, concrete repair, showers, changing rooms, entrance area, gastronomy, building services (ventilation, heating, electrical, water treatment), and sauna. Implementation will occur in seven construction phases (BA 1-7) during summer closing times from 2028 to 2033. Planning is scheduled to begin in 2026/2027. Estimated total costs are approximately 12.55 million EUR net, of which approximately 5.5 million EUR net are for KG 300 and approximately 5.2 million EUR net for KG 400. Planning phase 4 (approval planning) will only be commissioned for systems requiring direct approval; a reduction of the scope of services is reserved.

CONTRACTING AUTHORITY

Name

Stadtwerke Landshut

City

Landshut

Country

DE

CLASSIFICATION

Procedure Type

neg-w-call

Contract Type

Services

Main CPV

71000000, Architectural, construction, engineering and inspection services.

Other CPV

71300000, Engineering services.

71321300, Plumbing consultancy services.

71321400, Ventilation consultancy services.

71321200, Heating-system design services.

71330000, Miscellaneous engineering services.

71320000, Engineering design services.

ADDITIONAL DETAILS

EU Funded

Yes

Suitable for SMEs

Yes

Electronic Submission

Required

Legal Basis

32014L0024

DEADLINES & TIMELINE

Submission Deadline

31 days remaining

(LOT-0001)

Published

TENDER DOCUMENTS

31 days remaining

Similar Tenders

Explore CPV 71

Technical Planning for Successive Renovation of Landshut Indoor Pool

Technical Planning for Technical Equipment (ELT): Basic services for service phases 1-3, 5-9 for plant groups 4, 5, 6, 8 according to § 55 para. 1 sentence 2 HOAI 2021, Part 4, Section 2 in conjunction with Annex 15 HOAI 2021, plus special services for the successive renovation of the Landshut indoor pool. The indoor pool, built in the early 1970s, requires fundamental renewal of the roof structure, building envelope, pool deck, sanitary and changing areas, and the building's technical infrastructure (ventilation, heating, electrical, treatment plant). The pool system (stainless steel) is in good condition and not part of the fundamental renovation. Implementation will occur in seven construction phases (BA 1: roof, ceiling, facade; BA 2: pool deck; BA 3: concrete repair; BA 4: showers, changing rooms; BA 5: entrance area, gastronomy; BA 6: technical systems; BA 7: sauna), each during summer closing periods. Planning is scheduled to begin in 2026/2027 for service phases 1-5 across all construction phases; execution (from service phase 6) is planned from 2028 to 2033. The estimated total renovation costs are approximately 12.55 million EUR net, of which approx. 5.5 million EUR net are for cost group 300 and approx. 5.2 million EUR net for cost group 400.

Stadtwerke Landshut

·Landshut
Deadline:August 06, 2026

Architectural services for successive renovation of Landshut indoor swimming pool

Architectural services for the successive renovation of the Landshut indoor swimming pool: Basic services for service phases 1-9 for building and interior design according to § 34 Abs. 3 HOAI 2021, Part 3, Section 1 in conjunction with Annex 10 HOAI 2021, as well as special services. The renovation of the indoor swimming pool, built in the early 1970s, includes the roof structure, building envelope, pool deck, sanitary and changing areas, and the entire building services infrastructure (ventilation, heating, electrical, treatment plant). The pool system (stainless steel lining from 2005) is in good condition and will not undergo fundamental renovation. Implementation will occur in seven construction phases during summer closing times: BA 1 (roof, ceiling, facade), BA 2 (pool deck), BA 3 (concrete repair), BA 4 (showers, changing rooms), BA 5 (entrance area, gastronomy), BA 6 (technical systems), BA 7 (sauna). Planning is scheduled to start in 2026/2027, with construction planned from 2028 to 2033. Estimated total costs are approximately 12.55 million EUR net, of which approx. 5.5 million EUR net are for KG 300 and approx. 5.2 million EUR net for KG 400.

Stadtwerke Landshut

·Landshut
Deadline:August 06, 2026
€1.5M

Safety review and documentation analysis for third-party dams and reservoirs in intercommunity basins 2026-2031

Services for the safety review and analysis of safety documentation for third-party dams and reservoirs in intercommunity basins for the period 2026-2031, including support for coordination, training, and dissemination of dam safety information.

Dirección General del Agua

·Madrid
Deadline:September 01, 2026

Architectural services for new school building Realschule Regenstauf

Architectural services for the new school building of Max-Ulrich-von-Drechsel-Realschule Regenstauf: basic services for service phases 4-9 for building and interior design planning according to § 34 para. 3 HOAI 2021, Part 3, Section 1 in conjunction with Annex 10 HOAI 2021, SiGeKo services according to § 8.1 of the HAV-KOM contract, and special services. The new school building, with a main usable area of approx. 5,000 m², will be connected to the existing canteen building and sports facilities. Planning and realization must meet at least the KfW 40 efficiency house standard, considering sustainability, accessibility, wood as a building material, CO2-neutral energy supply, high energy efficiency, low greenhouse gas emissions, low life cycle costs, and high quality of stay and use. Service phase 7 (assistance with procurement) is valued at 3%. Construction is planned to start in spring 2027, with completion by the school year change 2028/2029. Excluded are demolition works (except for canteen connection), outdoor facilities, and specialist planning services for technical equipment and energy consulting. The measure is subject to funding regulations.

Landkreis Regensburg

·Regensburg
Deadline:August 06, 2026

Find matching tenders automatically

With Patterno-HIT, receive relevant tenders daily, automatically filtered to your company profile.

Book Demo Now