Construction works for A59, 2nd construction phase, Berliner Brücke West connection areas
Construction works for the 2nd main construction phase of A59, Berliner Brücke West connection areas: Production of 6 engineering structures (settling basin ABS 01, settling basin ABS 02, lifting station HWB 09, AB_RRB 01 & HWB 08, retaining structure BW 58, retaining structure BW 4N), including posts and anchoring for a noise barrier; road construction works such as production of A40 carriageway, sections of A59 and ramps, widening of A40, production of embankment fillings for ramps 610, 660 and connection for ramp 620, adaptation of ramps, production of temporary structures, construction roads and access routes, restoration of roads in the secondary network; landscaping works; production of a new drainage system; demolition works for an allotment garden area; measures on the Ruhrverband collector, including damming of old collectors.
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Portal — LOT-0000NON-RESTRICTED-DOCUMENT
- TED HTML — 573919-2026HTML
- TED PDF — 573919-2026PDF
- TED XML — 573919-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.