Site setup for new railway tunnel training facility construction
Site setup and construction water supply for the new railway tunnel training facility at the Thuringian State Fire and Disaster Protection School, Crossen branch: 1 double office container, 1 washroom/WC facility, 1 shower room (each to be erected, maintained, dismantled); construction of 3,100 m² of construction road; dismantling of 4,500 m² of construction road; 1 construction sign 5.00/7.75 m (to be erected, maintained, dismantled); 210 m construction fence (1m height), 150 m construction fence (2m height) (each to be erected, maintained, dismantled); 240 m pre-insulated pipe system PE 40x3.7 TW; 4 construction water distributors.
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Portal — LOT-0001NON-RESTRICTED-DOCUMENT
- TED HTML — 604440-2026HTML
- TED PDF — 604440-2026PDF
- TED XML — 604440-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.