Skip to main content
Activeted-533756-2026

Excavation and Shell Construction for Kita Lotte Lemke

Excavation and shell construction for the new construction of a two-story timber kindergarten: foundation of columns and walls on a floor slab with a circumferential reinforced concrete plinth; frost protection via strip foundations/frost barriers; strip foundations and floor slab on lean concrete plugs extending to load-bearing subsoil; adherence to foundation specifications from soil reports and supplementary settlement assessments; earthworks include all necessary excavation and backfilling for construction, structural stability, and technical supply and disposal of the building.

CONTRACTING AUTHORITY

Name

Stadt Heilbronn Rechtsamt - Zentrales Vergabemanagement -

City

Heilbronn

Country

DE

Website

CLASSIFICATION

Procedure Type

Open Procedure

Contract Type

Works

Main CPV

45112000, Excavating and earthmoving work.

Other CPV

45223220, Structural shell work.

ADDITIONAL DETAILS

EU Funded

Yes

Suitable for SMEs

No

Electronic Submission

Required

Legal Basis

32014L0024

31 days remaining

Similar Tenders

Explore CPV 45

Window and Door Works for the New Kita Lotte Lemke

Construction of a two-story daycare center (Kita) in timber construction with a flat roof on a concrete slab, footprint approx. 20x35 m. The timber framework stands partly on reinforced concrete plinths; roof and ceiling are planned as cross-laminated timber ceilings or prefabricated BSH beam elements. Load-bearing exterior walls are timber frame walls, load-bearing interior walls are cross-laminated timber walls. Facades consist of rough-sawn green-glazed larch board formwork for exposed areas and flat wood three-layer panels with a light green glaze for covered areas. Windows in weather-protected zones are wooden windows with a beige glaze, in directly exposed areas wood-aluminum windows with color-matched aluminum shells. Textile sun protection in light beige is provided directly in front of the windows. Height specifications: ground floor finished floor level (FFL) at +/- 0.000m (+165.160m above sea level), first floor FFL at +3.540m (+168.700m above sea level), attic parapet at +7.520m (+172.680m above sea level).

Stadt Heilbronn Rechtsamt - Zentrales Vergabemanagement -

·Heilbronn
Deadline:September 03, 2026

New Construction of Lotte Lemke Daycare Center

New construction of a two-story timber structure with a flat roof on a concrete slab for the Lotte Lemke daycare center. The floor plan measures approximately 20x35 m. Above the concrete slab, a timber framework stands, partly on reinforced concrete plinths. The roof and ceiling are planned as cross-laminated timber ceilings or prefabricated ceiling elements made of glulam beams, resting on walls and beams. Loads from the roof and ceiling are transferred through the walls and the column-beam structure into the foundation. Load-bearing exterior walls are planned as timber frame walls, and load-bearing interior walls as cross-laminated timber walls. Bracing is provided by the roof and ceiling diaphragms and the cross-laminated timber interior walls. All solid components are conventional reinforced concrete constructions; only the elevator pit is planned as a watertight concrete (WU) structure. The exterior facades are divided into two surfaces: directly exposed facades are rough-sawn, green-glazed larch board formwork, while structurally covered areas are flat, three-layer timber panels with a light green glaze. Windows in weather-protected zones are timber windows with a beige glaze; all other directly exposed areas will have timber-aluminum windows. Reference heights are +/- 0.00 = +165.160m above sea level for the ground floor (top of finished floor), +3.540m = +168.700m above sea level for the first floor (top of finished floor), and +7.520m = +172.680m above sea level for the attic (top of parapet).

Stadt Heilbronn Rechtsamt - Zentrales Vergabemanagement -

·Heilbronn
Deadline:September 03, 2026

Sanitary installations for the new kindergarten building Kita Lotte Lemke

Sanitary installations for the new kindergarten building: 150 m sound-insulated wastewater pipe, approx. 30 m insulated rainwater pipe, 10 pcs. stainless steel floor drains, approx. 420 m stainless steel drinking water installation pipe, 4 pcs. installation elements with washbasins, 14 pcs. WCs with installation element, 5 pcs. wash troughs with installation element.

Stadt Heilbronn Rechtsamt - Zentrales Vergabemanagement -

·Heilbronn
Deadline:September 10, 2026

Drywall Installation for Kita Lotte Lemke

Drywall installation for a two-story timber construction with a flat roof on a concrete slab foundation, footprint approx. 20x35 m: floor-by-floor execution coordinated with window installation, HVAC, electrical, painting, and plastering works; adherence to fire, sound, thermal, and moisture protection requirements; installation of partition walls and furring on concrete, cross-laminated timber ceilings, or screed, with one wall side remaining open for building services installations; execution of wet room walls and flexible connections; ensuring sound insulation through proper cable routing, mineral wool insulation, and tight connections; predominantly acoustic ceilings, kitchens with hygiene and acoustic requirements.

Stadt Heilbronn Rechtsamt - Zentrales Vergabemanagement -

·Heilbronn
Deadline:September 08, 2026

Find matching tenders automatically

With Patterno-HIT, receive relevant tenders daily, automatically filtered to your company profile.

Book Demo Now