Modernization of DJ 792D km 0+000 – 12+300 DJ792 Mocrea – Chier – Târnova
Modernization of county road DJ 792D km 0+000 – 12+300 DJ792 Mocrea – Chier – Târnova: Total length 12,542.64 m. Works include curve design according to STAS 863-85 and ORDIN 45/1998, carriageway widening and super-elevation. The longitudinal profile is designed according to STAS 863-85 and ORDIN 1296/2017 for a design speed of 30-60 km/h. The road will be modernized as technical class IV with two lanes, as per Ordinul Ministerului Transporturilor No. 1296/30.08.2017. The current condition includes a degraded carriageway with potholes, cracks, fissures, porous surfaces, unevenness, ruts, insufficient bearing capacity, and deficient rainwater drainage.
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Portal — LOT-0000NON-RESTRICTED-DOCUMENT
- TED HTML — 583695-2026HTML
- TED PDF — 583695-2026PDF
- TED XML — 583695-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.