Plastering works for new construction of Medical Center 2.0 Hansestraße in Barleben
Interior plastering works for the new construction of a medical center with 5 practices at Hansenstraße 42 in Barleben: 180 m² protective covering, 2,340 m² substrate inspection and sweeping, 120 m² bonding primer on concrete surfaces for interior plaster, 370 linear meters edge profiles, 2,340 m² substrate inspection and sweeping, 700 m² cement-lime plaster (interior wall, single-layer, Q3), 1,640 m² gypsum plaster (interior wall, single-layer, Q3), 334 linear meters reveal plaster, plastering of 105 roller shutter boxes, plastering of 99 window sills, 112 m² lime-gypsum plaster (ceilings, single-layer, Q3), 27 m gypsum plaster B2 (stair stringers, Q3), closing of 150 linear meters installation slots. The construction project begins in June 2026 and ends at the end of October 2027.
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Portal — LOT-0000NON-RESTRICTED-DOCUMENT
- TED HTML — 592995-2026HTML
- TED PDF — 592995-2026PDF
- TED XML — 592995-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.