Skip to main content
Activeted-536750-2026

Framework Agreement for Guide Posts and Accessories

Supply of guide posts and accessories: for the Nordost, Ost, Nord, Nordwest, Westfalen, Rheinland branches.

CONTRACTING AUTHORITY

Name

Die Autobahn GmbH des Bundes

City

Berlin

Country

DE

Website

CLASSIFICATION

Procedure Type

Open Procedure

Contract Type

Supplies

Main CPV

34928410, Marker posts.

LOTS (2)

LOT-0001Supplies

Leitpfosten und Zubehör für Niederlassungen Nord

LOT-0002Supplies

Leitpfosten und Zubehör für Niederlassungen Süd

ADDITIONAL DETAILS

EU Funded

Yes

Suitable for SMEs

No

Electronic Submission

allowed

Legal Basis

32014L0024

33 days remaining

Similar Tenders

Explore CPV 34

Construction and operational technical upgrade for Bürgerwaldtunnel and Heidenäckertunnel on the A98

Construction and operational technical upgrade of the Bürgerwaldtunnel and Heidenäckertunnel on the A98: mining excavation for rescue tunnels (18,200 m³), shotcrete (4,000 m³), reinforced concrete (1,300 m³), reinforcing steel (250 t), nailing (3,200 m), anchors (13,000 m); additionally operational technical equipment including reinforced concrete (60 m³), reinforcing steel (5 t), cable laying (220,000 m), cable trench (1,700 m³), cable protection pipes (5,000 m).

Die Autobahn GmbH des Bundes - NL Südwest

·Stuttgart
Deadline:November 12, 2026

Temporary Bypass and Demolition of Existing Structure for A565/A61

Construction work for a temporary bypass and the demolition of an existing structure: approx. 3,910 m² excavation shoring (sheet piling), approx. 575 m³ excavation, approx. 9,500 m³ earth material for ramps (delivery and installation), including material for backfilling, approx. 80.5 m temporary bridge (provided by the client), approx. 318 t steel transport for temporary bridge SS80 (bridge components), approx. 155 t steel transport for temporary bridge SS80 (launching nose), approx. 26 t steel transport for temporary bridge SS80 (roller batteries), approx. 150 m³ in-situ reinforced concrete, approx. 215 m² formwork, approx. 25 t reinforcing steel, approx. 1,250 m³ demolition and dismantling of concrete, approx. 6,200 m³ earthworks including road surface breaking, approx. 150 m installation of DN 300 pipelines, approx. 850 m³ frost protection layer 0/32, approx. 1,640 m² asphalt base course made of AC 22 T S, approx. 1,600 m² asphalt binder course made of SMA 16 B S, approx. 1,600 m² asphalt wearing course made of SMA 8 S, approx. 1,240 m dismantling of safety barriers, approx. 1,122 m installation of safety barriers, approx. 6 units dismantling of transition constructions, approx. 13 units installation of transition constructions, approx. 2 units dismantling of crash attenuators, and approx. 2 units installation of crash attenuators.

Die Autobahn GmbH des Bundes - NL Rheinland

·Krefeld
Deadline:September 02, 2026

Reconstruction of BAB 29, km 4.025 - km 10.025, both carriageways

Earthworks, road construction, and civil engineering for the reconstruction of BAB 29 between km 4.025 and km 10.025 on both carriageways.

Die Autobahn GmbH des Bundes - NL Nordwest

·Hannover
Deadline:August 11, 2026

Replacement New Construction of Noise Barriers for the A 59

Replacement new construction of noise barriers: Construction work on the A 59 motorway.

Die Autobahn GmbH des Bundes - NL Rheinland

·Krefeld
Deadline:August 14, 2026

Find matching tenders automatically

With Patterno-HIT, receive relevant tenders daily, automatically filtered to your company profile.

Book Demo Now