Fence Repair for Vratsa 2 Substation
Fence repair and new construction for Vratsa 2 Substation: Removal of an existing external fence and construction of a new external fence along the property boundaries, total length 258 m, including associated gates. Removal of the existing (internal) fence of the 110 kV outdoor switchgear (ORU) and construction of a new fence, total length 57 m, including associated gates. The terrain has a slight slope; the fence is executed on individual foundations, except for one section between the gates of the external fence where a strip foundation is constructed. Demolition works: dismantling of fence panels and posts, transport and pedestrian gates, cutting and breaking of reinforced concrete structures, elements, and pavement, loading and transport of construction waste. Installation works: excavation for foundations and pavements, formwork for concrete walls, curb beams, plinths, and strip foundations, manufacturing, delivery, and installation of reinforcing steel, delivery and laying of lean and reinforced concrete, and delivery and installation of fence system elements according to a standard design.
CONTRACTING AUTHORITY
Name
МРЕЖОВИ ЕКСПЛОАТАЦИОНЕН РАЙОН - МОНТАНА
City
гр.Монтана
Country
BG
CLASSIFICATION
Procedure Type
Open Procedure
Contract Type
Works
Main CPV
45000000, Construction work.
ADDITIONAL DETAILS
EU Funded
Yes
Electronic Submission
Required
Legal Basis
32014L0025
DEADLINES & TIMELINE
Submission Deadline
46 days remaining(LOT-0001)
Published