Conversion and Expansion for Single-Site Operation for Gemeinschaftskrankenhaus Bonn
Construction measures for the concentration of the St. Elisabeth and St. Petrus sites of Gemeinschaftskrankenhaus Bonn at the St. Petrus location: Conversion and expansion of existing structures, construction of a new building section extending building part C/D, integration of existing building stock, optimization of patient, personnel, and logistics routes. Estimated net total construction costs (as of August 2026): approx. 610,000.00 EUR for site preparation and development (KGr. 200), approx. 31,191,000.00 EUR for building construction (KGr. 300), approx. 35,137,000.00 EUR for technical installations (KGr. 400), of which approx. 3,377,100.00 EUR for user-specific installations (KGr. 470), approx. 1,111,400.00 EUR for outdoor facilities (KGr. 500), and equipment and existing stock takeover (KGr. 600).
Gemeinschaftskrankenhaus St. Elisabeth/St. Petrus/St. Johannes gGmbH
·Bonn