Lightning Protection and Earthing Works for New Operating Building L41
New construction of a transformer station as operations building L41 at wastewater treatment plant 1 of the city of Nuremberg. The measure includes the construction of an earthing system consisting of a meshed ring earth electrode in the ground and a functional equipotential bonding earth electrode in the building's floor slab, as well as a lightning protection and down conductor system corresponding to lightning protection class III. The main quantities include 300 m of earthing conductor stainless steel Rd10 and 90 m of ring earthing tinned copper cable 120mm². The dominant trade is lightning protection and earthing works.
Stadt Nürnberg - Stadtentwässerung und Umweltanalytik Nürnberg
·Nürnberg